CIP
Jason Bousfield
Prefabricated wall, floor and roof cassettes including external cladding.
Post tensioned wall panel system for fast installation Baubuche (beech) LVL staircases and flooring
Pre-fabrication allows 1000m2 of floor space to be installed in only 3.5 days