MPP14 – Rafter Cassettes (Port Macquarie, NSW) – May 2019

Project Profile
Location: Port Macquarie, NSW
Supplier: Eastlands Frame & Truss
Builder: Richard Swan Constructions
Products:  Rafter cassettes using LVL
Other:  Detailing and cutting by Meyer Timber NSW. Assembly by Eastlands F&T.
Read the Cassette Floor Factsheet
On site ready for install
Lifting into position
20min later….Done.

“20 minutes to install. It saved us 2 days and was a lot easier and safer.”