engineered

Wet Area Set Downs
|, ,
Changes to the National Construction Code (NCC 2022) mean that set down wet areas will become increasingly common. These include: • A fall in the floor is now required to all floor wastes, including non- mandatory wastes. • The fall in the floor has been...
Read more
meyPOST4 Product Guide
|, , ,
meyPOST4 posts are H4 treated and are designed to be used in external applications. They are strong (GL8 rated) and very durable. meyPOST4 posts are made from sustainable Radiata pine with a dressed smooth finish. meyPOST4 is glue laminated to ensure that the post stays...
Read more
Strong-Wall® Site-Built Portal Frame System
|, ,
Strong-Wall® Site-Built Portal Frame System 1300 STRONGTIE | strongtie.com.au 2 | Strong-Wall® Site-Built Portal Frame System 1300 STRONGTIE | strongtie.com.au F-L-PFSAU20 © 2020 Simpson Strong-Tie Company Inc. Strong-Wall® Site-Built Portal Frame System The Strong-Wall site-built portal frame system (PFS) provides designers, builders and contractors an...
Read more
Wall Frame Tie-down Specification
|, ,
A complete solution for N2 wind – sheet roof - studs @ 450 c/c – trusses @ 600 c/c – SINGLE storey
Read more
QuikStick™ Rafter And Truss Fastening System
|, , ,
QuikStick™ Rafter And Truss Fastening System
Read more
MPP21 – Baubuche Intercultural Screen – Apr 2020
|
Hot off the press and only completed a week ago, Meyer Timber is proud to have worked with Lipman to supply Baubuche screening for a common area at Macquarie University. The project involved supply of 68 main blades which we 8.4m long, 600mm wide and...
Read more
Points to minimise the potential of Floor Squeaks
|, ,
POINTS TO MINIMISE THE POTENTIAL OF FLOOR SQUEAKS
Read more
Durability of Meyer Timber Engineered Wood Products Including LVL, I-joist and Glulam
|, ,
Untreated Engineered Wood Products (EWP) are suitable for use as structural members in protected, dry environments. They can also be impregnated with chemicals to increase their durability against various hazards. The hazard levels as defined in AS/NZS 1604 (and AS1684) are shown...
Read more
How to deal with Construction Loads
|, ,
November 2019 Construction loads can be defined as those loads imposed on a partially completed structure during and as a result of the construction process. These loads may include, but are not limited to, materials, personnel, and equipment placed onto a structure which has not...
Read more
Alternative fixing methods for Meyer Timber brackets
|, ,
Numerous brackets supplied by Meyer Timber are supplied with 3.75Øx35mm long nails for fixing. This is a minimum requirement as noted in the installation guide but it does not preclude the use of alternate connectors. This technical note outlines other suitable connectors that may be...
Read more