Projects

MPP68 – Tuross Heads meyBRACE – Dec 2024
|
You can have a meyBRACE … and then you can make the whole front wall of a 2 storey home a series of meyBRACE. Dahlsens Ulladulla asked us about replacing an expensive steel portal with meyBRACE. Following some minor design changes, $120K worth of steelwork...
Read more
MPP67 – Sigma Build – Nov 2024
|
Modular building is growing fast in Australia and seen as one of the ways to help solve the housing crisis. But this does not mean it all happens at one place. Sigma Build is an innovative company in QLD that uses volumetric pre-fabrication to create...
Read more
MPP66 – Feature Truss – Oct 2024
|
Visual effect is important for many people, especially when it come to feature elements in a home. Eastland Timber and Truss came to us asking about a feature truss which the owner wanted to look clean, so no nailplates or bolted connections. Added to this...
Read more
MPP65 – meyBRACE in multi-unit construction – Sep 2024
|
Front elevations of multi-unit developments, such as townhouses, are often narrow and required to accommodate both a garage opening and an entryway, posing a challenge for bracing due to the short wall lengths involved. This was the situation in a recent project in Charlemont (VIC),...
Read more
MPP64 – Belrose Precut – Aug 2024
|
With our prefab line in NSW operating for more than 6 years now, we have developed solid relationships with builders focused on panelisation. When Sean Coddington from Sustainable Design & Construct asked about our ability to precut every piece of timber for a high end...
Read more
MPP63 – Complete Floor Systems – Jul 2024
|
Some homes are large, and then there are some that take this to the next level. A recent project in NSW delivered a Meyer Timber complete floor system for a first floor area of over 620sqm. This included all EWP components as well as flooring,...
Read more
MPP62 – meyBRACE on timber floor – Jun 2024
|
It’s not often the meyBRACE timber portal system is required on the first floor of a two storey dwelling. When NNH Engineers specified the meyBRACE for this application, the challenge was to offer a simple tie-down solution on the timber floor that could replicate the...
Read more
MPP61 – Scarborough Roof Cassettes – May 2024
|
Imagine a project nestled against the escarpment on a sloping site just north of Wollongong, NSW. An architect designed house to make the most of the narrow block with lots of weird angles and an inverted roof falling into a central courtyard. The perfect job...
Read more
MPP60 – Mount Martha meyBRACE – Apr 2024
|
The meyBRACE for this project was specified by the engineer as an alternative to sheet bracing with tie-down rods. Due to the 3.5m high walls, the design capacity of the sheet brace had to be reduced by over 20%, rendering it inadequate for the application....
Read more
MPP59 – Edmonson Park Cassettes – Mar 2024
|
When Frasers Property wanted to speed up their build process whilst making it safer as well, they turned to floor cassettes for their development at Edmonson Park, NSW. The 20 units of cassettes is the 2nd project they have completed this way with the 3D...
Read more