Projects

MPP74 – Coburg House – Jul 2025
|
This Coburg (VIC) residence is far more than a typical home — it’s a high-performance build that delivered significant savings in time, waste, and embodied carbon. Featuring extensive use of meyJOIST and meySPAN, the project leveraged precision off-site construction with sub-floor, mid-floor, and roof cassettes,...
Read more
MPP73 – Alpine Passivhaus – Jun 2025
|
As mentioned in recent articles in InDetail, the passivhaus movement is growing. Located in Jindabyne in the Snowy Mountains of NSW, Klaus and the team at Alpine Passivhaus are amongst a handful of businesses that combine technology with panelisation to create healthy, sustainable high-performance houses....
Read more
MPP72 – King Island House – May 2025
|
In just 35 days, Timber Building Systems (TBS) delivered a fully completed 4-bedroom, 4-bathroom workers' accommodation model from stumps to turnkey on King Island—a first of its kind. Shipped from Welshpool, this innovative build amazed the local community with its speed, quality, and sustainability. Designed...
Read more
MPP71 – Eclipse Federal Portal Frames – Apr 2025
|
Eclipse Passive House approached Meyer Timber to see what options there were for a project they were building for Northern NSW. The 2 dwellings had big open living areas as well as front facades with glass windows and highlights over. In terms of bracing, the...
Read more
MPP70 – meyBRACE in multi-unit development (Part 2) – Mar 2025
|
In one of our recent newsletters, we featured a typical application of meyBRACE on the front façade of a multiple two-storey townhouse project in Charlemont VIC (PP#65). In this edition, we are showcasing another example of its use in a multi-unit development in Doveton VIC....
Read more
MPP69 – Gundaroo Shed – Feb 2025
|
Timber portal shed enquiries are coming through to Meyer Timber more often, indicating people want a change from a steel shed. This was the case for a customer of Dahlsens Trussme who asked about timber options for a shed he was building. Meyer Timber designed...
Read more
MPP68 – Tuross Heads meyBRACE – Dec 2024
|
You can have a meyBRACE … and then you can make the whole front wall of a 2 storey home a series of meyBRACE. Dahlsens Ulladulla asked us about replacing an expensive steel portal with meyBRACE. Following some minor design changes, $120K worth of steelwork...
Read more
MPP67 – Sigma Build – Nov 2024
|
Modular building is growing fast in Australia and seen as one of the ways to help solve the housing crisis. But this does not mean it all happens at one place. Sigma Build is an innovative company in QLD that uses volumetric pre-fabrication to create...
Read more
MPP66 – Feature Truss – Oct 2024
|
Visual effect is important for many people, especially when it come to feature elements in a home. Eastland Timber and Truss came to us asking about a feature truss which the owner wanted to look clean, so no nailplates or bolted connections. Added to this...
Read more
MPP65 – meyBRACE in multi-unit construction – Sep 2024
|
Front elevations of multi-unit developments, such as townhouses, are often narrow and required to accommodate both a garage opening and an entryway, posing a challenge for bracing due to the short wall lengths involved. This was the situation in a recent project in Charlemont (VIC),...
Read more