pre-fabrication

MPP44 – Blinkhorn Cct Roof Cassettes – Oct 2022
|,
The Meyer Timber NSW pre-fab team have done it again. This time it was roof cassettes made with 240mm deep meyJOIST rafters. Once on-site, it was installed in only 2 hours. The ease of installation along with the safety benefits of a stable working platform...
Read more
MPP38 – Henley Townhouses (Kalkallo) – Mar 2022
|
Timber Building Systems (TBS) have added yet another feather to their cap, by helping Henley Homes to transition from traditional building methods to pre-fabricated residential homes, the first of its kind in the builder’s 30-year history. The maiden project comprising of ten 2-storey townhouses is...
Read more
MPP19 – Portal Upgrade (Goulburn Aquatic Centre) – Feb 2020
|
It was a case of Meyer engineers coming to the fore, when others turned their backs, to help the community in Goulburn to re-build their popular aquatic centre in quick time. Our involvement, in both design and supply, also ensured that timber continued to play...
Read more
MPP18 – Staircase Cassettes (Zac Homes) – Jan 2020
|
Our pre-fabrication team in NSW has now begun offering pre-fabricated or flat pack stairs – taking them to the next level (pun intended). This can be done as a kit form or fully assembled and is of huge benefit to builders as it provides safe...
Read more