Afzal

MPP52 – Skate Ramp – July 2023
|
Structural timber is not all about buildings. You can use it to have fun as well. This month’s project profile is for a home built skate ramp out of timber. 17mm film faced formply to create the curves, H3 treated pine to support the deck,...
Read more
meyBATTEN
|, ,
Read more
MPP51 – Timber portal shed in Mt Gambier – Jun 2023
|
Timber portal frames have been used in shed construction for many years, but it has certainly been on the decline over the last two decades. The reasons may vary between cost, availability and the dominance of steel sheds in the market. We have now developed...
Read more
MPP50 – Qikpanel floor cassettes in Gisborne – May 2023
|
In this edition, we feature our Qikpanel floor system playing an important role in Carbonlite’s latest project. In this two-storey house in Gisborne, Australia’s top ultra energy efficient home builder, Carbonlite, has chosen Qikpanel as an efficient and trusted floor system to complement their panelised...
Read more
MPP49 – Raked meyBRACE with ridge support – Apr 2023
|
Small additions seem simple but they can often cause issues with respect to bracing.  This was the case with a home on the South Coast of NSW.  The front wall was full of glazing and was the only wall in that direction to accommodate bracing. ...
Read more
MPP48 – Meyer Timber QLD Office Building – Mar 2023
|
With a floor area of 485 m2, this Meyer Timber QLD Office Building was built with the TBS panelised wall systems, comprising of timber framing, insulation and a hybrid OSB-MDF interior panel that provided a painted finished internal wall lining. A total of 157 LM...
Read more
MPP47 – meyBRACE for multiple units – Feb 2023
|
When faced with a set of 5 units with no solid walls across the front elevation, the detailers at South Coast Timber Supply (SCTS) turned to meyBRACE. By installing one meyBRACE portal around the garage door and another around the front window of each unit...
Read more
MPP46 – Townhouses at Mount Annan (Part 2 – Video on Installation) – Dec 2022
|
We follow on from last month’s edition, where we introduced a video (Part 1) showing the fabrication stages of a large cassette floor project. This involved 149 townhouses at Mount Annan, which was delivered by Meyer Timber through Campbelltown F&T for the Sunland Group. Part...
Read more
MPP45 – Townhouses at Mount Annan (Part 1 – Video on manufacturing) – Nov 2022
|
Meyer Timber NSW just completed a large cassette floor project involving 149 townhouses at Mount Annan. Delivered through Campbelltown F&T for the Sunland Group, this also included prefabricated stair and void cassettes. Enjoy the video showing the first phase of this project involving detailing and...
Read more
MPP44 – Blinkhorn Cct Roof Cassettes – Oct 2022
|,
The Meyer Timber NSW pre-fab team have done it again. This time it was roof cassettes made with 240mm deep meyJOIST rafters. Once on-site, it was installed in only 2 hours. The ease of installation along with the safety benefits of a stable working platform...
Read more