Afzal

MPP33 – Scale Wadsworth Floor Roof – Sep 2021
|
Recently the Meyer Timber pre-fab team was challenged with a complex build on a steep ocean-side block in Gerroa. Headed by builder and architect Matt Chan from Scale Architecture and combining forces with Wadsworth Joinery, the project pushed many boundaries and the end result was...
Read more
MPP32 – Qikpanel floor cassettes (Drouin, VIC) – Aug 2021
|
Our Qikpanel sub-floor cassette offer is gaining plenty of interest in the Victorian Gippsland region. We completed our third supply and install job only last week, with a fourth project lined up for installation late-August. This month’s Project Profile focuses on the latest job in...
Read more
MPP30 – Floor Cassettes with a Difference – May 2021
|
The Eternity Life in West Footscray (Melbourne), a 61-unit (4-storey) residential development, was opened in late 2020. The floor system for this project was designed and supplied by Meyer Timber/TBS using pre-fabricated cassettes incorporating a custom-designed acoustic system. The builder, who traditionally uses concrete floors,...
Read more
MPP29 – Sub-floor cassettes (Drouin, VIC) – Apr 2021
|
Our first sub-floor cassette job for 2021 was a real success, as we were able to meet all expectations of the builder. A solid and level floor completed within a day allowed the carpentry crew to seamlessly install wall frames on the following morning. The...
Read more
MPP28 – Cassette Floors, Stairs and Roof – Mar 2021
|
Recently Meyer Timber combined forces with modular building fabricator Pro9 Global. Located in Greystanes NSW, this project used the Pro9 insulated wall panels externally, along with traditional timber stud walls internally. Walls were followed in short succession by Meyer Timber cassette floor, stairs and roof....
Read more
MPP27 – meyBRACE Timber Portal System – Dec 2020
|
Notwithstanding the difficult year, we have been able to introduce new products and systems to the domestic market on a regular basis. meyBRACE timber portal system is the latest offer that has started to make a difference by resolving complex wall bracing issues..
Read more
MPP26 – Passive House – Nov 2020
|
We were challenged with the design and manufacture of cassettes for a valley roof, to meet stringent Passive house standards. The result: Each roof stage installed in under 2 hours. Walls by Westview F&T and roof by Meyer Timber tested to achieve less than 0.6...
Read more
MPP25 – Ceiling Cassettes (Mid North Coast City Council, NSW) – Oct 2020
|
Richard Crookes construction was awarded the contract to re-purpose an old Masters warehouse to be the new headquarters for the Mid North Coast City Council in NSW. With a very short build time and over 1,500m2 of ceilings to provide for internal offices, they chose...
Read more
MPP24 – Pe-fabricated floor, roof and stairs – Aug 2020
|
Recently we had a chance to show-case all of Meyer Timber’s cassette options, with pre-fabricated floor, rafters and stairs within a single house. Accurate framing by Dahlsens Ulladulla and builder Matt Stewart ensured all the members slotted together with precision. Saving weeks of on-site labour,...
Read more
MPP23 – TBS Panelised Wall System (Toorak Rd, Melbourne) – Jul 2020
|
Our ‘cousins’ Timber Building Systems (TBS) were challenged with the task of installing 2 luxury apartments on the rooftop of an existing shopping arcade right in the heart of the South Yarra shopping precinct. This project certainly presented some challenges, with no lay-up area, no...
Read more