Afzal

MPP26 – Passive House – Nov 2020
|
We were challenged with the design and manufacture of cassettes for a valley roof, to meet stringent Passive house standards. The result: Each roof stage installed in under 2 hours. Walls by Westview F&T and roof by Meyer Timber tested to achieve less than 0.6...
Read more
MPP25 – Ceiling Cassettes (Mid North Coast City Council, NSW) – Oct 2020
|
Richard Crookes construction was awarded the contract to re-purpose an old Masters warehouse to be the new headquarters for the Mid North Coast City Council in NSW. With a very short build time and over 1,500m2 of ceilings to provide for internal offices, they chose...
Read more
MPP24 – Pe-fabricated floor, roof and stairs – Aug 2020
|
Recently we had a chance to show-case all of Meyer Timber’s cassette options, with pre-fabricated floor, rafters and stairs within a single house. Accurate framing by Dahlsens Ulladulla and builder Matt Stewart ensured all the members slotted together with precision. Saving weeks of on-site labour,...
Read more
MPP23 – TBS Panelised Wall System (Toorak Rd, Melbourne) – Jul 2020
|
Our ‘cousins’ Timber Building Systems (TBS) were challenged with the task of installing 2 luxury apartments on the rooftop of an existing shopping arcade right in the heart of the South Yarra shopping precinct. This project certainly presented some challenges, with no lay-up area, no...
Read more
MPP12 – Qikpanel Cassettes (Melbourne) – Nov 2018
|
Over the past couple of months Meyer Timber has been working hard in delivering a Qikpanel floor system to a 64-unit development in Victoria. This involves a patented system using inverted T-joists which are chemically bonded directly to the flooring to create strong but lightweight...
Read more
MPP05 – LSL Studs – Sep 2015
|
Laminated Strand Lumber (LSL) was used as a viable option for wall frames (studs and wall plates) in this project in Echuca (VIC). “It’s a dream to use. You are not spending days straightening walls” was the builder’s final comment.
Read more